50 Mu | Integrated Method (Water Diversion-Plant-Water Simultaneously) | April 11 – May 10, 2025
Unique Planting Method
We adopted a “Drill-Plant-Water” synchronous workflow without drip irrigation:
- Team Roles: Drilling (3 workers) → Planting (5) → Watering (2)
- Daily Progress: 1.2-1.8 Mu/day
- Water Management: Irrigation Practices
Daily Log
April 14, 2025 ,Sunny 21°C
First Day
- Drilling: Adjusted spacing to 15cm×15cm grid
- Planting: 1,200 seedlings/hour by 5 workers
- Watering: 2L/plant (increased by 20% due to dry soil)
- Progress: 6 Mu completed (12% total)
“Soil moisture insufficient. Need to pre-transport water tomorrow.” – Field note


